Even though the school year has ended the team has been hard at work. The mechanical team is completing the detailed design of the digging and storage mechanisms along with the mobility system. The prototype should hopefully be up and running before the beginning of the school year. There has been great progress from the electrical team. A prototype has been constructed to begin testing out the software before the mechanical team is done constructing our own frame.

We installed a very large white board in our team for brainstorming or drawing sketches while brainstorming! Everyone on the team has been enjoying this and find it to be very useful. It has even served as a project screen while watching the 2013 NASA Lunabotics Competition.